巴西港口铁矿石装港情况(7.23-8.6)
发表日期:2015/7/27 11:33:37 兰格钢铁
TUBARAO预计有24条船舶靠泊作业,总的作业量为483.8万吨
TUBARAO PIER ONE
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
ANANGEL CONQUEROR | 24-7 | 24-7 | 26-7 | 165,000 | VALE | CHINA |
MINERAL NINGBO | 21-7 | 26-7 | 28-7 | 176,000 | VALE | NETHERLANDS |
CAPE BALTIC | 27-7 | 28-7 | 30-7 | 160,000 | VALE | JAPAN |
BULK ASIA | 29-7 | 30-7 | 31-7 | 170,000 | VALE | CHINA |
NAVIOS JOY | 2-8 | 2-8 | 4-8 | 170,000 | VALE | |
GREAT QIN | 5-8 | 5-8 | 7-8 | 170,000 | VALE | |
LINDA OLDENDORFF | 31-7 | 31-7 | 2-8 | 180,000 | VALE | |
HE FU STAR | 15-7 | 24-7 | 26-7 | 125,500 | VALE | TAIWAN |
OCEAN LORD | 27-7 | 27-7 | 28-7 | 37,700 | VALE | CHINA |
RED QUEEN | 24-7 | 28-7 | 30-7 | 65,000 | VALE | GERMANY |
GODDESS SANTOSH DEVI | 30-7 | 30-7 | 31-7 | 45,000 | VALE | BRAZIL |
WARSAW | 1-8 | 2-8 | 3-8 | 57,000 | VALE | |
MAGSENGER 10 | 4-8 | 4-8 | 7-8 | 110,000 | VALE |
TUBARAO PIER TWO
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
ORE BRASIL | 20-7 | 23-7 | 25-7 | 391,200 | VALE | PHILIPPINES |
STELLAR UNICORN | 23-7 | 25-7 | 26-7 | 290,000 | VALE | CHINA |
SAMJOHN VISION | 17-7 | 26-7 | 27-7 | 202,200 | VALE | U.A.E. |
ORE ITALIA | 25-7 | 27-7 | 29-7 | 390,000 | VALE | JAPAN |
NSU MILESTONE | 26-7 | 29-7 | 30-7 | 245,200 | VALE | SINGAPORE |
CAPE INFINITY | 27-7 | 30-7 | 31-7 | 245,800 | VALE | KOREA |
STELLAR OCEAN | 30-7 | 1-8 | 2-8 | 290,000 | VALE | CHINA |
STELLAR PIONEER | 30-7 | 2-8 | 3-8 | 290,000 | VALE | CHINA |
RIGEL | 30-7 | 3-8 | 5-8 | 297,571 | VALE | |
MAGDALENA OLDENDORFF | 5-8 | 5-8 | 6-8 | 170,000 | VALE | NETHERLANDS |
SEA INDONESIA | 5-8 | 6-8 | 7-8 | 395,000 | VALE | OMAN |
ITAGUAI预计有9条船舶靠泊作业,总的作业量为139.2万吨
CSN Terminal
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
PORTAGE | 17-7 | 23-7 | 25-7 | 150,000 | CSN | |
BESIKTAS KAZAKHSTAN | 24-7 | 25-7 | 26-7 | 150,000 | CSN | |
LEOPOLD D | 24-7 | 26-7 | 27-7 | 150,000 | CSN | |
CAPE ZENITH | 29-7 | 30-7 | 31-7 | 150,000 | CSN | |
BULK SUCCESS | 2-7 | 2-7 | 3-8 | 150,000 | CSN | |
AQUAMRINE | 5-8 | 5-8 | 7-8 | 172,000 | CSN |
CPBS Terminal
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
ANANGEL EXPLORER | 24-7 | 25-7 | 26-7 | 150,000 | VALE | |
CAPE STORK | 26-7 | 27-7 | 29-7 | 170,000 | VALE | |
ORE BELO HORIZONTE | 27-7 | 29-7 | 31-7 | 150,000 | VALE |
GUAIBA ISLAND TERMINAL预计有6条船舶靠泊作业,总的作业量为130.8万吨
Guaiba Island Terminal-North
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
CHINA STEEL INTERGRITY | 21-7 | 25-7 | 27-7 | 130,000 | VALE | |
ORE MANGARATIBA | 24-7 | 28-7 | 1-8 | 170,000 | VALE |
Guaiba Island Terminal-South
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
ORE SALVADOR | 20-7 | 24-7 | 27-7 | 260,000 | VALE | |
PACIFIC OPAL | 24-7 | 27-7 | 29-7 | 260,000 | VALE | |
ATLANTIC TRADER | 27-7 | 29-7 | 31-7 | 228,180 | VALE | |
PACIFIC RUBY | 28-7 | 31-7 | 3-8 | 260,000 | VALE |
PONTA UBU预计有8条船舶靠泊作业,总的作业量为75.8万吨
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
GUO TOU 301 | 3-7 | 24-7 | 25-7 | 82,500 | SAMARCO | USA |
CAROLINE OLDENDORFF | 23-7 | 25-7 | 26-7 | 55,000 | SAMARCO | TRINIDAD AND TOBAGO |
AP ARGOSY | 24-7 | 26-7 | 27-7 | 77,500 | SAMARCO | BELGIUM |
PETALON | 26-7 | 27-7 | 28-7 | 82,500 | SAMARCO | BELGIUM |
KRAKOW | 30-7 | 30-7 | 31-7 | 55,000 | SAMARCO | |
SICILIAN EXPRESS | 29-7 | 31-7 | 1-8 | 75,000 | SAMARCO | |
GENCO LONDON | 26-7 | 26-7 | 28-7 | 160,000 | SAMARCO | ARGENTINA |
RZS FORTUNE | 27-7 | 30-7 | 1-8 | 170,000 | SAMARCO |
PONTA DA MADEIRA预计有23条船舶靠泊作业,总的作业量为514.1万吨
PONTA DA MADEIRA PIER ONE
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
ORE SAO LUIS | 24-7 | 24-7 | 26-7 | 290,000 | VALE | CHINA |
COSCO ANSTEEL | 25-7 | 26-7 | 28-7 | 290,000 | VALE | CHINA |
RENATE N | 26-7 | 28-7 | 29-7 | 260,000 | VALE | CHINA |
BERGE KIBO | 29-7 | 30-7 | 31-7 | 280,000 | VALE | |
TUBARAO MARU | 30-7 | 31-7 | 2-8 | 330,000 | VALE | JAPAN |
ANANGEL SHAGANG | 31-7 | 2-8 | 4-8 | 250,000 | VALE | CHINA |
PONTA DA MADEIRA PIER THREE
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
UBC OHIO | 25-7 | 25-7 | 26-7 | 110,000 | VALE | |
AM LIBERIA | 29-7 | 30-7 | 31-7 | 90,000 | VALE | FRANCE |
YONG TONG | 31-7 | 4-8 | 6-8 | 70,000 | VALE | |
BRAVE SAILOR | 22-7 | 23-7 | 25-7 | 170,000 | VALE | FRANCE |
FALCON CONFIDENCE | 22-7 | 25-7 | 26-7 | 170,000 | VALE | ITALY |
KSL SAN FRANCISCO | 27-7 | 27-7 | 28-7 | 176,000 | VALE | CHINA |
CAPE LILAC | 27-7 | 29-7 | 30-7 | 185,000 | VALE | JAPAN |
EVGENIA | 29-7 | 30-7 | 31-7 | 175,000 | VALE | |
AQUARIUS DREAM | 31-7 | 1-8 | 3-8 | 170,000 | VALE | |
ATLANTIC BRIDGE | 27-7 | 3-8 | 4-8 | 155,000 | VALE | |
NAVIOS MELODIA | 3-8 | 4-8 | 6-8 | 170,000 | VALE | CHINA |
SOLAR EMBER | 4-8 | 6-8 | 6-8 | 160,000 | VALE | KOREA |
YUMETAMOU | 9-7 | 3-8 | 4-8 | 180,000 | VALE | GERMANY |
PONTA DA MADEIRA PIER FOUR
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 | 目的地 |
BAOSTEEL ELABORATION | 22-7 | 23-7 | 25-7 | 290,000 | VALE | CHINA |
SEA ESPIRITO SANTO | 24-7 | 25-7 | 27-7 | 390,000 | VALE | MALAYSIA |
ORE NINGBO | 24-7 | 28-7 | 30-7 | 390,000 | VALE | |
SHANDONG DA CHENG | 31-7 | 5-8 | 8-8 | 390,000 | VALE |
ACU PORT 预计有4条船舶靠泊作业,总的作业量为56.9万吨
船名 | 预计到港时间 | 预计靠泊时间 | 预计离港时间 | 货量 | 发货人 |
E.R. BAYERN | 26-7 | 27-7 | 29-7 | 142,100 | ANGLO AMERICAN |
ANANGEL TRUST | 29-7 | 29-7 | 31-7 | 143,000 | ANGLO AMERICAN |
GENCO TIBERIUS | 30-7 | 31-7 | 1-8 | 144,000 | ANGLO AMERICAN |
NATTY | 3-8 | 3-8 | 5-8 | 140,000 | ANGLO AMERICAN |
信息监督:马力 010-63967913 13811615299
相关文章
- 7月27日巴西铁矿石远期现货参考价格2015/7/27
- 7月27日铁矿石期货午报2015/7/27
- 澳大利亚港口铁矿石装港情况(7.23-8.6)2015/7/27
- 巴西港口铁矿石装港情况(7.23-8.6)2015/7/27
- 花旗:大宗商品暴跌时的最佳交易 做空铁矿石2015/7/27
- 中国港口铁矿石到港情况(7.26-8.6)2015/7/27